BUILDING PERMIT FEE SCHEDULE
| CLASS | | | | FEES | | | Minimum Fee | 25.00 | | | | Residential Structures (Single Family and Duplex) | | | | | | Living area per sq. ft. | 0.08 | | | | | Garage, carports, porches, patios and accessory buildings, per sq. ft. | .06 | | | | Commercial Buildings | | | | | | First 50,000 sq. ft. per sq. ft. | 0.09 | | | | | Parking, paving and walks per sq. ft. | 0.007 | | | Repairs and alterations to existing structures and completion of shell buildings. Minimum fee, for first $2,000 | 25.00 | | | | $2,001 to $15,000 | $25.00 for first $2,000 plus $4.00 for each additional thousand or fraction thereof, to and including $15,000 | | | $15,001 to $50,000 | $75.00 for first $15,000 plus $3.00 for each additional thousand or fraction thereof, to and including $50,000 | | | $50,001 to $100,000 | $180.00 for first $50,000 plus $3.00 for each additional thousand or fraction thereof, to and including $100,000 | | | $100,001 to $500,000 | $300.00 for first $100,000 plus $1.50 for each additional thousand or fraction thereof, to and including $500,000 | | | $500,000 and up | $930.00 for first $500,000 plus $1.00 for each additional thousand or fraction thereof. | | Demolition: | | | | | Residential Structure | 35.00 | | | | Commercial Structure | 75.00 | | | | Accessory Structure | 25.00 | | | Structure relocation including manufactured homes: | | | | | Out of City | 45.00 | | | | Within City | 75.00 | | | Re-inspection fee – This fee is charged when rejected on the first inspection and each subsequent inspection. | 25.00 | | | Certificate of Occupancy – For all commercial buildings | 40.00 | | | Swimming Pools | | | | | Residential | 20.00 | | | | Commercial | 30.00 | |
ELECTRICAL LICENSE AND PERMIT FEES | CLASS | | | | FEES | | | Master Electrician ($5,000 Bond Required) | 35.00 | | | | For Issuing the following permits: | 20.00 | | | | Installation of Service: | | | | | | Up to 400 Amps | 5.00 | | | | | Over 400 Amps | 20.00 | | | | Installation of Branch Circuits: | | | | | | 110 Branch Circuits | 2.00 ea. | | | | | 220 Branch Circuits | 5.00 ea. | | | | | 3 Phase Circuits | 6.00 ea. | | | | Transformers: | | | | | | Up to 50 KVA | 20.00 | | | | | Temporary Installation: Carnivals or similar installation | 50.00 | | | | | Re-inspection Fee: This fee is charged when rejected on the first inspection and each subsequent inspection. | 25.00 | | | | | Penalty: In case any work, for which a permit is required by this chapter, is started prior to obtaining said permit, the fee above specified shall be doubled. The payment of such doubled fee shall not relieve any person from fully complying with the requirements of this chapter in the execution of work nor from other penalties prescribed herein. | | | | 30 Day Vacancy Inspection | 15.00 | | | | | Commercial Clerk | 30.00 | | | | Miscellaneous: | | | | | | Construction service pole | 15.00 | | | | | Utility Connections | 15.00 | | | | | Mechanical Permit | 25.00 plus 10.00/system | |
PLUMBING PERMIT AND LAWN SPRINKLER FEE SCHEDULE | CLASS | | | | FEES | | | | For issuing each permit, fee shall be: | 20.00 | | | | For each house sewer, water service and gas service (yard lines installation or repair) | 7.00 | | | | For each plumbing fixture, trap, grease and sand trap, hot water heater, and gas fired appliance | 3.00 | | | Re-inspection Fees – This fee is charged when rejected on the first inspection and each subsequent inspection | 25.00 | | | | | | | | |
|